Project management
Project management includes planning the programme, tracking interfaces, reporting progress. The listed scope excludes design work, which stays with the designer.
Programmes planned
Rock Rail SE Management in London: project management, asset records and safety documentation for rail works and the interfaces around them.


Programmes planned
Recent jobs and the detail behind them. A short works package is often a sensible place to start.



Programmes planned
Most enquiries are about a programme to run, asset records to straighten out, or a safety file to complete.
Project management includes planning the programme, tracking interfaces, reporting progress. The listed scope excludes design work, which stays with the designer.
Asset records includes compiling records, checking against site, tracking updates. The listed scope excludes structural assessment and engineering sign-off.
Safety documentation covers tracking documents, chasing sign-offs, assembling the handover file. Everything else is confirmed in writing first.
We talk through what you need, what is realistic and what it costs, so you can decide with the full picture in front of you.
Programmes planned
Programmes, interfaces and records are managed together, so progress is measured and the close-out file is built as the work proceeds.
How it works
The same sequence runs on a short package and a long programme.
Works, possession windows, interfaces and dates are set out in writing.
The programme is built around the windows, with each interface given an owner and a date.
Progress is tracked against the plan and reported each period.
Records and the handover file are completed as the works finish.
We would rather say no at the start than apologise at the end.
Programmes planned
Progress reported in
Tell us the address and what you want done. We will reply with availability and a clear figure.